Medium-Voltage (MV) Metal Clad switchgears 6,3kV 1600A 40kA

Holguín (Cuba)

Country

Cuba

Year

2019

Description

The project involves the supply of n. 30 medium-voltage Normal Clad switchgear cubicles 12kV 1600A 40kA with a frequency of 60Hz and n. 6 low-voltage (LV) Euro-SDS switchboards at the Lidio Ramon Perez thermoelectric plant, in Felton, in the province of Holguin.

The thermoelectric power plant is one of the largest and most powerful in the eastern Cuba area, located at 800km from Havana, and it is fundamental for the national electricity system. In consideration of the territorial characteristics, our technical and engineering know-how was relevant to the development of the project.

Related projects

N. 2 photovoltaic plants with a total power of 5 MWp

Camagüey, Mayajigua (Cuba)

The project is addressed to n. 2 photovoltaic plants: Camaguey and Mayajigua with a total power of 5 MWp.

MV/LV Cement transformation cabin 15/0.8kV for photovoltaic system

Cuneo (Italy)

We have carried out an STC-Kiosk transformation cabin, destined for a photovoltaic system in the province of Cuneo, in Piedmont.