We have carried out an STC-Kiosk transformation cabin, destined for a photovoltaic system in the province of Cuneo, in Piedmont.
Our Engineering Hub has designed, constructed and installed an MV/LV 15/0.8kV 1MVA cement transformation cabin, equipped with an air-insulated (AIS) medium-voltage (MV) electrical switchgear ATR 24kV 630A 16kA, low-voltage (LV) Euro-SDS panels, LV disconnector with fuses 800V AC, dry-type elevator transformer, interconnecting cables and auxiliary equipment. This tailor-made project was completed in a few weeks, thanks to the know-how and flexibility of our engineers. To speed up work, we made the roof removable, in order to install the transformer in a second phase.
Related projects to Photovoltaics
eHouse 33kV for PV plant expansion
Viterbo (Italy)
We have designed, manufactured and supplied an eHouse intended for the expansion of the photovoltaic plant in Montalto di Castro, Italy.
MV E-House 20kV for photovoltaic plant
Cipollaretta (Italy)
Design and construction of an E-House, for the Alzo electrical substation, carried out by our Sister Company C.R. Project Service. It is connected to the largest photovoltaic system in the Viterbo area and occupies 101 hectares in the Cipollaretta area.