MV E-Houses 34.5kV and 13.8kV for the port area

Artemisa (Cuba)

Country

Cuba

Year

2014

Location
Solutions
Products
Description

The project has involved the implementation and supply of materials for the 34,5kV and 13,8kV electrical substations in the port area of Artemisa.

The implementation of medium-voltage (MV) switchgears ATR 13,8kV 630A 20kA, with a frequency of 60Hz and with LSC2A, involves:

  • 11 cubicles for the main electrical substation "CGD" situated in the port
  • 20 cubicles for n. 2 electrical substations, 6 of which consist of columns 34,5kV 630A 16kA and are used for the operation of the refrigeration terminals