MV E-House 4.16kV for oil plant

Nafoora (Lybia)

Country

Libya

Year

2020

Description

The project includes the design, construction, and commissioning of a compact and modular substation STC-Box and it is addressed to an oil plant in Nafoora, Sirte Bay, in Lybia.

It is an STC-Box shelter 4.16kV IP54, containing gas-insulated (GIS) medium-voltage ATR-Ring switchgears 12kV, low-voltage switchboards 110Vdc, air-conditioning, firefighting systems, and auxiliary equipment.
The E-house main features are:
- Optimized Design
- Easy Installation
- Customization
- Plug & Play
- Short installation time

Related projects to eHouse

N. 2 HV/MV Mobile Substations 110/33kV 16MVA

Basra (Iraq)

These are the first n. 2 mobile substations designed and realized by C.R. Technology Systems S.p.A. and are used to provide electricity to remote areas of Basra.

MV E-House 35/20/10kV for industrial district

Peshkopi (Dibër) - Albania

Design, construction and supply of a medium-voltage (MV) compact substation in Peshkopi, industrial area of the Albanian city Dibër.