The project consists of the renewal of high-voltage electrical substations previously designed and installed by C.R. Technology Systems and managed by the national authority for electricity.
The project has included the supply of production and auxiliary relay, circuit breakers 24kV/2500A/31,5kA, batteries, fuses, assembly kit, communication modules and network monitoring devices.
Related projects
Medium-Voltage (MV) Metal Clad duplex switchgears 13,8kV 1250A 25kA
Ciego de Avila (Cuba)
The medium-voltage switchgears allow to increase the supply of electrical energy produced by the substations of Cayo Coco y Guillermo, which are part of a project previously carried out.
Medium–Voltage (MV) switchgears 36kV for the Expansion of Electrical Substation
Artemisa (Cuba)
In the province of Artemisa, a highly inhabited Cuban region, the supply of medium-voltage switchgears 36kV aimed to expand the electrical substation for the “Zal” logistics activity zone.