N. 6 Transformation cabins 13.8kV and 34.5kV for electrical grid

Havana (Cuba)

Country

Cuba

Year

2020

Description

The project has involved the engineering, construction and supply of n. 6 STC-Kiosk, which have been integrated into the Cuban public grid. These small size substations have been refined with high-resistant painting, suitable for Caribbean humid and saline environments, and customized with internal equipment.

N.3 ring-configuration transformation centres 13,8kV 630kVA 415-240V 60Hz, and N.3 ring-configuration transformation centres 34,5kV 400kVA 415-240V 60Hz, containing:

  • Medium-voltage (MV) gas-insulated ATR-Ring switchgears 24kV
  • Low-voltage (LV) Euro P&C switchboard 630A 25kA
  • RTU for connection to SCADA system
  • Firefighting system
  • Electric meter
  • Temperature sensors
  • Smoke detectors
  • Alarm system
  • Protection relays

Related projects to Transformation cabin

N. 2 Transformation cabins and n. 2 switching stations for PV greenhouses

Oristano (Italy)

The project includes the design, manufacturing, and supply of n. 2 Transformation Cabins STC-Box and n. 2 Delivery Cabins for two photovoltaic greenhouse plants, in Oristano (Sardinia).

N. 10 E-Houses 34.5kV for temporary applications

La Havana (Cuba)

It is a customized project to provide temporary energy in building sites in Cuban provinces, wherever is needed.