HV/MV indoor Substation 110/13.8kV 25MVA

Varadero (Cuba)

Country

Cuba

Year

2015

Description

Construction of an electrical substation in Varadero, located in a structure designed to protect the high-voltage (HV) and medium-voltage (MV) equipment against the atmospheric conditions that characterize this geographical area.

The project included the construction of a gas-insulated electrical substation, consisting of a H-shaped hybrid system, equipped with two input switches and two start switches, six isolators, six overvoltage surge arresters, two power transformers 25MVA and a medium-voltage (MV) switchgear Normal Clad 24kV and auxiliary service transformer.
The substation also includes low-voltage (LV) Euro SDS panels, a production and automation system for the electrical substation consisting of Euro P&C protection panels, control systems, automation and supervision, a duplicated direct current system, lighting systems, video surveillance and fire protection system, air conditioning.

Related projects to Electrical substation

MV/MV indoor substation 34.5/13.8kV 10MVA

Matanzas (Cuba)

In the Cuban area of Matanzas, to grant the increasing demand for electricity during the tourist season, we realized an electrical substation that guarantees high technological performances together with a harmonious impact in the landscape context.

HV/MV Substation 110/34.5kV 40MVA

Holguín (Cuba)

Engineering study, construction and commissioning of an outdoor electrical substation HV/MV 110/34.5kV 40MVA for the implementation of the new tourist center of Ramón de Antilla, in Holguín.