Indoor Electrical substation 110/13,8kV

Varadero (Cuba)

Description

Construction of an electrical substation in Varadero, located in a structure designed to protect the high-voltage (HV) and medium-voltage (MV) equipment against the atmospheric conditions that characterize this geographical area.

The project included the construction of a gas-insulated electrical substation, consisting of a H-shaped hybrid system, equipped with two input switches and two start switches, six isolators, six overvoltage surge arresters, two power transformers 25MVA and a medium-voltage (MV) switchgear Normal Clad 24kV and auxiliary service transformer.
The substation also includes low-voltage (LV) Euro SDS panels, a production and automation system for the electrical substation consisting of Euro P&C protection panels, control systems, automation and supervision, a duplicated direct current system, lighting systems, video surveillance and fire protection system, air conditioning.

Related projects to High-Voltage electrical substation

High-Voltage (HV) Electrical Substation 132kV in Cartiere del Polesine

Adria, Loc. Smergoncino (Italy)

The project, result of an important partnership, is addressed to a historical industrial company located in Smergoncino, in Rovigo area. The long-lasting know-how gained in the high-voltage field has made it possible to increase the plant power supply.

Implementation of n. 4 Electrical Substations

Cayo Coco, Cayo Guillermo, Uva Caleta, Flamenco (Cuba)

The ambitious project has seen the creation of four electrical substations addressed to different areas of the Cuban Republic.