MV/MV indoor Substation 13.8/34.5kV 25MVA

Camagüey (Cuba)

Description

Camagüey is a popular holiday destination in Cuba, where the recent increase in the power demand has made it necessary to invest in the implementation of new electrical substations.

We have carried out the design, construction and installation of the new Alto Aji substation that will power the surrounding hotel facilities and tourist structures. The substation is equipped with:

  • Air-insulated (AIS) medium voltage (MV) electrical switchgear Normal Clad 24kV 1250A 25kA (n. 20 cubicles)
  • Medium voltage electrical switchgear 36kV1250A 25kA (n. 14 cubicles)
  • Power transformers 25MVA
  • Auxiliary transformers
  • Low-voltage (LV) switchboards Euro-SDS
  • Protection panels Euro-P&C
  • SCADA system
  • Video operation
  • Firefighting protection
  • Auxiliary equipment

We have studied a solution appropriate to the tough environmental condition of Cuba, which is subject to hurricanes and strong winds. Moreover, the plant has to be carried out in harmony with the surrounding area, in order to safeguard the architecture and visual impact of this attractive landscape.

For these reasons, the electrical substation is set up inside a building, which protects and hides the electrical equipment, and the interconnection with a further substation, that we are implementing soon, will be carried out through underground cable.

Related projects to SCADA Solution

Nr 2 E-HOUSE 33kV SWITCHING STATION – BUMPER FOR BESS

We are currently engaged in a new project, involving the construction of two MV Switching stations for an upcoming Battery Energy Storage System (BESS) initiative. These stations will be situated in Severalles Farm, Ilmer, Princess Risborough, UK, supplying 100MWh as storage capacity.

Supervisory system for rooftop PV plant

Artemisa (Cuba)

We designed, customized and configurated a supervisory system for rooftop photovoltaic plant.