HV/MV indoor Substation 110/13.8kV 25MVA

Varadero (Cuba)

Description

Construction of an electrical substation in Varadero, located in a structure designed to protect the high-voltage (HV) and medium-voltage (MV) equipment against the atmospheric conditions that characterize this geographical area.

The project included the construction of a gas-insulated electrical substation, consisting of a H-shaped hybrid system, equipped with two input switches and two start switches, six isolators, six overvoltage surge arresters, two power transformers 25MVA and a medium-voltage (MV) switchgear Normal Clad 24kV and auxiliary service transformer.
The substation also includes low-voltage (LV) Euro SDS panels, a production and automation system for the electrical substation consisting of Euro P&C protection panels, control systems, automation and supervision, a duplicated direct current system, lighting systems, video surveillance and fire protection system, air conditioning.

Related projects to Electrical substation

HV/MV Substation 110/34.5kV 2x25MVA

Varadero (Cuba)

The project has included the study, installation and supply of the electrical substation "Punta Hicacos".

Renewing of HV/MV Substation 220/38/34.5/6kV

Havana (Cuba)

The project consists of the modernization of the Antillana de Acero electrical substation and it has been carried out in the Cotorro district of Havana, which has an essential function for the area as it supplies electricity to the nearby steel plant.