N. 5 substations 13.8kV and 34.5kV 54.8MVA

Jardines del Rey (Cuba)

Description

The project has involved the implementation of n. 5 E-House compact substations, located in Jardines del Rey, a touristic strategical Cuban area nearby the airport and seaport.

Location: Jardines del Rey north
Electrical substation 2 x 16/20MVA, equipped with n. 16 medium-voltage Normal Clad cubicles 13.8kV 1250A 25kA

Location: Bautista
Electrical substation 2 x 2.5MVA, equipped with n. 8 medium-voltage Normal Clad cubicles 13.8kV 1250A 25kA and n. 10 medium-voltage cubicles 34.5kV 1250A 25kA

Location: Jardines del Rey
Electrical substation 2 x 6.3MVA, equipped with n. 4 medium-voltage Normal Clad cubicles 13.8kV 1250A 25kA and n. 23 medium-voltage cubicles 34.5kV 1250A 25kA

Location: Port area
Electrical substation 2 x 6.3MVA, equipped with n. 15 medium-voltage metal-clad cubicles 34.5kV 1250A 25kA

Location: Airport
Electrical substation 2 x 6.3MVA, equipped with n. 12 medium-voltage metal-clad cubicles 34.5kV 1250A 25kA

Moreover, each substation includes:

  • Power transformers
  • Protection relays
  • LV panels EuroP&C for the monitoring and automation of the plant
  • LV panels Euro SDS
  • SCADA system
  • HVAC system
  • Internal lighting
  • Reactors for compensating long underground MV lines

Related projects to Electrical substation

Retrofit of the Busduct in a Thermoelectric Power Plant

Matanzas (Cuba)

The project has been carried out in record time in the Cuban city of Matanzas and has included design, installation and supply of the busduct and its auxiliary transformer for a thermoelectric power plant.

Reactors and Medium-Voltage (MV) Switchgears for electrical substations

Jardines del Rey (Cuba)

Supply of materials and auxiliary accessories for the set-up of four reactors for the delivery of electricity in theJardines del Rey area in the province of Ciego de Ávila, in Cuba.