Retrofit of the Busduct in a Thermoelectric Power Plant

Matanzas (Cuba)

Country

Cuba

Year

2018

Description

The project has been carried out in record time in the Cuban city of Matanzas and has included design, installation and supply of the busduct and its auxiliary transformer for a thermoelectric power plant.

Realization of an aluminum cylindrical busduct, protected by a covering that connects the generator to the power transformer.

Related projects to Electrical substation

HV/MV Substation 110/34.5kV 2x40MVA

Artemisa (Cuba)

The project has included the study, construction, and installation of a hybrid GIS electrical substation, to supply energy to an industrial area in Atemisa.

MV Substation 34.5kV

Artemisa (Cuba)

The project has been carried out in the famous industrial center in Artemisa. It has included accessories for an electrical substation 34,5kV and the associated substation "Switching Center".