HV/MV Substation 110/34.5kV 2x40MVA

Artemisa (Cuba)

Description

The project has included the study, construction, and installation of a hybrid GIS electrical substation, to supply energy to an industrial area in Atemisa.

The substation is divided into:

  • 110kV field, including power transformers 40MVA, disconnectors, surge arresters, circuit-breakers
  • 34,5kV field, including n. 25 medium-voltage (MV) Normal Clad switchgear cubicles 34,5kV 1250A 25kA
The monitoring and protection of the plant are granted by low-voltage (LV) switchboards and SCADA system. Furthermore, the electrical substation has a firefighting plant, air-conditioning system, protection against atmospheric dischargers and auxiliary equipment.

Related projects to Electrical substation

Electrical installation works for industrial plant

Pieve Vergonte (Italy)

The project has included the works to expand the high-voltage (HV) electrical substation serving the Hydrochem Srl plant in Pieve Vergonte (Piedmont).

HV/MV Substation 110/34.5kV 2x25MVA

Varadero (Cuba)

The project has included the study, installation and supply of the electrical substation "Punta Hicacos".