HV/MV Substation 110/13.8kV 40MVA

Havana (Cuba)

Country

Cuba

Year

2014

Description

Realization of a high-voltage to medium-voltage electrical substation in a historic thermoelectric plant in Havana.

The project has included the engineering study, construction and commissioning of a high-voltage substation 110/13,8kV 40MVA. It includes 110kV circuit-breakers, disconnectors, transformers, surge arresters, n. 18 medium-voltage (MV) Normal Clad switchgear cubicles 13,8kV, low-voltage (LV) Euro P&C switchboards for the protection and automation of the plant, low-voltage Euro SDS switchboards for the measurement and energy distribution, 3-phase reactors, plant lighting system, firefighting system, auxiliary electrical equipment.

Related projects to Electrical substation

MV/MV Electrical substation 13.8/34.5kV 50MVA

Cayo Cruz (Cuba)

Study, design, construction and supply of electrical substation equipment addressed to n. 8 diesel turbines in Cayo Cruz, Cuba.

Renewing of HV/MV Substation 220/38/34.5/6kV

Havana (Cuba)

The project consists of the modernization of the Antillana de Acero electrical substation and it has been carried out in the Cotorro district of Havana, which has an essential function for the area as it supplies electricity to the nearby steel plant.