The project is an STC-Box designed for the electrical supply of public lighting systems, covering a vast area in Cuban provinces.
It has included the design, construction and commissioning of a pre-assembles modular STC-Box containing N. 16 medium-voltage (MV) gas-insulated switchgear panels ATR-Ring 36kV 630A 16kA 60Hz, N. 2 (LV) switchboards Euro-SDS 220/127 V 60HZ, n. 2 power transformer, SCADA system, auxiliary electrical material.
The STC-Box is connected to n. 12 STC-Kiosk with ring configuration, featured as follow:
- N. 2 100kVA 34,5/0,415/0,240 kV
- N. 5 630kVA 34,5/0,415/0,240kV
- N. 5 300kVA 34,5/0,415/0,240 kV
Related projects to eHouse
MV E-House 20kV for photovoltaic plant
Cipollaretta (Italy)
Design and construction of an E-House, for the Alzo electrical substation, carried out by our Sister Company C.R. Project Service. It is connected to the largest photovoltaic system in the Viterbo area and occupies 101 hectares in the Cipollaretta area.
MV E-House 36kV for Artemisa development area
Artemisa (Cuba)
Designed, construction and supply of n. 2 modular, pre-assembled and fully tested STC-Box cabins, for the expansion of a power plant serving the industrial area of Artemisa, in Cuba.