MV E-House 20kV for photovoltaic plant

Cipollaretta (Italy)

Country

Italy

Year

2021

Description

Design and construction of an E-House, for the Alzo electrical substation, carried out by our Sister Company C.R. Project Service. It is connected to the largest photovoltaic system in the Viterbo area and occupies 101 hectares in the Cipollaretta area.

The photovoltaic system has a power of 89.5 MWp and is connected to the national grid.
Our compact electrical substation STC-Box is equipped with:

  • N. 7 medium-voltage (MT) air-insulated (AIS) cubicles ATR 20kV 2500A 25kA
  • Low-voltage panels (LV)
  • Protection panels
  • SCADA system
  • Auxiliary transformer
  • HVAC systems
  • Auxiliary equipment

Related projects to eHouse

Our eHouse for BESS in Lincolnshire

Lincolnshire (United Kingdom)

We projected, manufactured and supplied a switchroom, designed to improve the energy infrastructure in the UK: the supply of a fully equipped 33kV Switchroom STC-Box for a Battery Energy Storage System (BESS) located in Grimsby, Lincolnshire.

MV E-House 24kV for electrical grid

Quito (Ecuador)

The project aims to increase the electrification grid in Ecuador areas which suffer a lack of electricity.