Projects

Show details

Public lighting 30/200/750 Lux

Habana – Plaza de la Revolución (Cuba)

The ambitious project, carried out in just three months and inaugurated on the occasion of the May 1st, 2019 parade, guarantees a high energy-efficient lighting system in the stunning Plaza de la Revolucion.

Show details

Photovoltaic Plants 10MWp

Venegas, Matanzas, Camagüey, Mayajigua (Cuba)

The project includes n. 4 photovoltaic plants, with a total of 10MWp, located in 4 sites, situated in 3 different provinces of the Cuban Republic. It is part of the implementation plan of the Cuban economic development program, with the aim to reach a total of 700MW photovoltaic power supply by 2030.

Show details

Medium-Voltage (MV) Metal Clad switchgears 6,3kV 1600A 40kA

Holguín (Cuba)

The project involves the supply of n. 30 medium-voltage Normal Clad switchgears 12kV 1600A 40kA with a frequency of 60Hz and n. 6 low-voltage (LV) Euro-SDS switchboards at the Lidio Ramon Perez thermoelectric plant, in Felton, in the province of Holguin.

Show details

ISO Container 34,5/0,48kV 630kVA

Havana (Cuba)

The project has involved the supply and installation of ISO containers 34,5/0,48kV 630kVA, for the oil plant in Havana.

Show details

Indoor Electrical Substation “Casco Histórico” 110/13.8kV

Varadero (Cuba)

This project has the peculiarity of being installed inside a building specifically designed in respect of the surrounding environment, notoriously recognized for its touristic value.

Show details

Equipment for Electrical Substation 34,5kV 1250kVA

Artemisa (Cuba)

On the Cuban territory, in the province of Artemisa, it has been carried out a project aimed to supply electric energy to the port area, well-known both for being a holiday destination and a business hub.

Show details

Medium-Voltage (MV) Metal Clad Switchgears 12kV 4000A 40kA

Antillana da Acero (Cuba)

The project consists of an electrical substation requalification work. It is placed inside the iron and steel complex in Antillana de Acero in La Havana.

Show details

Retrofit of a High-Voltage (HV) Electrical Substation

Artemisa (Cuba)

The project consists of the renewal of high-voltage electrical substations previously designed and installed by C.R. Technology Systems and managed by the national authority for electricity.

Show details

IP65 Metal Clad Switchgears 17,5kV 400A 31,5kA (3s) 60Hz for Mining applications

Yauyos (Perù)

Outdoor installations of medium-voltage switchgears aimed to guarantee electricity to a company operating in the mining industry.

Show details

Medium-Voltage (MV) Metal Clad switchgears 12kV 2500A 25kA

Santa Cruz de la Sierra, Andrés Ibáñez (Bolivia)

The ambitious project has been destined to a cement factory in Santa Cruz de la Sierra, in Andrés Ibáñez, the largest city in Bolivia.

Show details

Metal Clad Switchgears IP65 12,6kV 630A 25kA (3s) for Mining application

Yauyos (Perù)

Outdoor installation of medium-voltage metal clad switchgears Normal Clad 12,6kV 630A 25kA (3s), IP65 degree of protection, galvanized with Sendzimir process, to grant switchgear protection against dust and pollution in mining applications.

Show details

The largest Rooftop Photovoltaic Plant in Cuba

Artemisa (Cuba)

The project has included the installation of four photovoltaic plants set on the roofs of four different warehouses.

Show details

Indoor Electrical substation 110/13,8kV

Varadero (Cuba)

Construction of an electrical substation in Varadero, located in a structure designed to protect the high-voltage (HV) and medium-voltage (MV) equipment against the atmospheric conditions that characterize this geographical area.

Show details

Implementation of Electrical Substations 34,5kV and 13,8kV

Artemisa (Cuba)

The project has involved the implementation and supply of materials for the 34,5kV and 13,8kV electrical substations in the port area of Artemisa.

Show details

High-Voltage (HV) Electrical Substation 110/34.5kV

Puerto Escondido (Cuba)

The project has involved the supply of material to increase the high-voltage electrical substation (HV) in the developing area of ​​Petrolero, in Puerto Escondido district.

Show details

N. 6 feed Pumps for Thermoelectric Plant

Santa Cruz (Cuba)

The project includes fuel pumps for the boiler of the thermal power plant of Santa Cruz, and various spare parts.

Show details

Supply of equipment for the energy block in the National Centre

Artemisa (Cuba)

The project, carried out in the industrial district called “National Center” located in Artemisa, has consisted of the supply of materials, products and systems, for the installation of medium-voltage distribution STC-Box shelters.

Show details

Underground Cable 100km 132kV for Substation Interconnection

Varadero (Cuba)

The project has seen the laying and start-up of a line cable 132kV with double circuit of 100km for the interconnection of a high-voltage (HV) substation in the Varadero Casco Histórico with other high-voltage substations. The present installation has been carried out between the Casco Histórico and Palmeras areas.

Show details

High-Voltage (HV) Electrical Substation 34,5kV

Artemisa (Cuba)

The project has been carried out in the famous industrial center in Artemisa. It has included accessories for an electrical substation 34,5kV and the associated substation "Switching Center".

Show details

Renewing of the High-Voltage (HV) Electrical Substation 220/38/34,5/6kV

Havana (Cuba)

The project consists of the modernization of the Antillana de Acero electrical substation and it has been carried out in the Cotorro district of Havana, which has an essential function for the area as it supplies electricity to the "José Marti" steel plant.

Show details

Compact substations 34,5kV

Cayo Paredon Grande (Cuba)

Design, supply and implementation of the compact substations “Cayo Paredon - Anton čechov” and “Cayo Cruz” 34,5kV in the Cayo Paredon Grande area, located in the north of archipelago Cayo Romano, in Camagüey.

Show details

Reactors and Medium-Voltage (MV) Switchgears for electrical substations

Cayo Coco (Cuba)

Supply of materials and auxiliary accessories for the set-up of four reactors for the delivery of electricity in the Cayería del Norte area in the province of Ciego de Ávila, a Cuban district.

Show details

Medium-Voltage (MV) Metal Clad duplex switchgears 13,8kV 1250A 25kA

Ciego de Avila (Cuba)

The medium-voltage switchgears allow to increase the supply of electrical energy produced by the substations of Cayo Coco y Guillermo, which are part of a project previously carried out.

Show details

Medium–Voltage (MV) switchgears 36kV for the Expansion of Electrical Substation

Artemisa (Cuba)

In the province of Artemisa, a highly inhabited Cuban region, the supply of medium-voltage switchgears 36kV aimed to expand the electrical substation for the “Zal” logistics activity zone.

Show details

Led Public Lighting 160W for the “Avenida Primera”

Varadero (Cuba)

Lighting of the "Avenda Pirmera" Street: the main artery of Varadero.

Show details

Cable for Interconnection of Substations: Varadero, Casco Histórico e Hicacos

Varadero (Cuba)

The project has seen the laying and set up of the line cable 123kV with double circuit of 43km for the interconnection of high-voltage substations (HV) in the Varadero Casco Histórico and other high-voltage substations. The present installation has been carried out between the Casco Histórico and Hicacos.

Show details

N. 7 COMPACT SUBSTATIONS STC-BOX 24kV 2000A 31.5kA 180MW

Guacara e Tucacos (Venezuela)

The project was carried out in Guacara and Tucacas, tourist cities located in Venezuela. It has seen the implementation of several compact substations, destined to Hyundai generator plants.

Show details

Medium-Voltage (MV) Normal Clad Switchgears IP65 40,5kV 630A 16kA (3s)

Chihuahua (Mexico)

Design, supply and implementation of metal-clad electrical panels in a mining company in Chihuahua.

Show details

Medium-Voltage (MV) Switchgears 6,3kV 2000A 25kA for “10 de Octubre” Thermoelectric Power Station

Nuevitas (Cuba)

The project had been carried out in the tourist area of Nuevitas, in the province of Camagüey and it has included the renewal of the thermoelectric power station “10 October”.

Show details

Medium-Voltage (MV) Normal Clad Switchgears 6,3kV 1600A 25kA

Narajito (Cuba)

The project has involved medium-voltage (MV) switchgears designed and constructed for Narajito, a historic district in the south of the Cuban capital.

Show details

SCT-Box containing Medium-Voltage (MV) ATR Switchgears 24kV 630A 20kA

Quito (Ecuador)

The project aims to increase the electrification grid in Ecuador areas which suffer a lack of electricity.

Show details

Metal-Enclosed ATR Switchgear 34.5kV 630A 16kA

Panama City (Panama)

The project was carried out in Panama City, with the aim of increasing the electrification grid.

Show details

Mobile Substation 115/13.8 kV 10 MVA

Aragua (Venezuela)

The project has involved the study and construction of a mobile substation 115/13.8kV 10MVA, with a frequency of 60Hz, with the aim of guaranteeing the supply of electricity in a rural area of Venezuela.

Show details

Retrofit of the Busduct in the Antonio Guiteras Thermoelectric Power Plant

Matanzas (Cuba)

The project has been carried out in record time in the Cuban city of Matanzas and has included design, installation and supply of the busduct and its auxiliary transformer for the Antonio Guiteras thermoelectric power plant.

Show details

Medium-Voltage Switchgears (MV) ATR-ring 36kV 630A 16kA

Artemisa (Cuba)

The project has been carried out in Artemisa, an important industrial center in Cuba.

Show details

Remote Control System for Lighting plant in Plaza de la Revolución

Plaza de la Revolución - L'Avana (Cuba)

The project has included the realization of a remote management system with power and control panels for the lighting system in Plaza de la Revolución in Havana.

Show details

Extension of 110kV and 36kV High-Voltage (HV) Substations

Artemisa (Cuba)

Supply of equipment and spare parts for electrical substations in the industrial developing area located at about 30 kilometers from the capital.

Show details

Supply of 34.5kV circuit-breakers

Havana (Cuba)

The project has involved the supply of circuit breakers, addressed to the Cuban capital.

Show details

Medium-Voltage (MV) Transformers 34,5kV 2000kVA

Artemisa (Cuba)

The project has included the supply of a medium-voltage transformer 34,5kV 2000kVA.

Show details

High-Voltage (HV) Electrical Substation 110/34.5kV “Punta Hicacos”

Varadero (Cuba)

The project has included the study, installation and supply of the electrical substation "Punta Hicacos".

Show details

High-Voltage (HV) Electrical Substation 110/34.5 kV

Artemisa (Cuba)

The project has involved the study, construction and start-up of an electrical substation in the province of Artemisa, in Cuba.

Show details

Carrying out of N. 61 STC-kiosk transformation centers

Havana (Cuba)

The ambitious realization has the aim of increasing the electric grid in the Cuban capital.

Show details

N.7 Photovoltaic Plants for a total Power of 15 MW

Granma, Pinar del Rio, Ciego da Avila, Santiago de Cuba, Guantanamo (Cuba)

The project, which has allowed to produce energy locally, has included n. 7 photovoltaic plants located in 5 different Cuban provinces: Granma, Pinar del Rio, Ciego da Avila, Santiago de Cuba and Guantanamo.

Show details

N. 22 Medium-Voltage shelters containing ATR switchgears

Puerto Cabello (Venezuela)

The project has included modular shelters and medium and low-voltage switchgears, for the modernization of generators in Venezuela.

Show details

Supply of electrical equipment

Porto Alegre (Brasile)

The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.

Show details

Electrification of rural areas in the Haitian Islands

Gonaives e Cabo Haitiano (Haiti)

The project has included n. 4 compact substations, with the aim to supply the electricity in the rural areas of Gonaives and Cabo Haitiano.

Show details

Normal Clad switchgears 24kV IP65 for Mine

Yauyos (Perù)

The project has the aim to increase the electrical grid of a mine located in the province of Yauyos (Peru) and it has involved the design, construction and supply of n. 7 medium-voltage Normal Clad switchgears 24kV 630A 31.5kA and 17.5kV 1250A 31.5kA, with IP65 protection degree, an auxiliary transformer 12600/230V 10kA, materials and accessories necessary for the start-up of the plant.

Show details

Implementation of n. 4 Electrical Substations

Cayo Coco, Cayo Guillermo, Uva Caleta, Flamenco (Cuba)

The ambitious project has seen the creation of four electrical substations addressed to different areas of the Cuban Republic.

Show details

Medium-Voltage (MV) Switchgears for Thermoelectric Plant

Nuevitas (Cuba)

The project has included engineering, construction and supply of a high-voltage (HV) electrical substation with medium-voltage Normal Clad switchgears for the electrification of a thermoelectric power station.

Show details

STC-Kiosk transformation centers with radial and ring configuration

Havana (Cuba)

The project consists of electrical equipment, materials and accessories necessary for the setup of nr. 61 transformation centers with radial and ring configuration, in the lively Cuban capital, Havana.

Show details

ELECTRICAL EQUIPMENT FOR PHOTOVOLTAIC PLANTS

Camagüey, Mayajigua (Cuba)

The project is addressed to n. 2 photovoltaic plants: Camaguey and Mayajigua with a total power of 5 MWp.

Show details

N. 6 STC-KIOSK FOR SECONDARY ELECTRICAL DISTRIBUTION

Havana (Cuba)

The project has involved the engineering, construction and supply of n. 6 STC-Kiosk, which have been integrated into the Cuban public grid. These small size substations have been refined with high-resistant painting, suitable for Caribbean humid and saline environments, and customized with internal equipment.

Show details

STC-BOX: Distribudora Plant

Havana (Cuba)

The project is an STC-Box designed for the electrical supply of public lighting systems, covering a vast area in Cuban provinces.

Show details

ROOFTOP PHOTOVOLTAICS ON FIREHOUSE

Artemisa (Cuba)

Set-up of a rooftop photovoltaic system on the Firehouse in Artemisa, Cuba.

Show details

High-Voltage (HV) Electrical Substation «Tallapiedra» 110/13,8kV 40MVA

Havana (Cuba)

Realization of a high-voltage electrical substation addressed to the historic thermoelectric plant "Tallapiedra" in Havana.

Show details

High-Voltage (HV) ELECTRICAL SUBSTATION 110/34.5kV 2x40MVA

Artemisa (Cuba)

The project has included the study, construction, and installation of a hybrid GIS electrical substation, to supply energy to an industrial area in Atemisa.

Show details

N. 4 COMPACT SUBSTATIONS FOR DEVELOPING INDUSTRIAL AREA

Havana (Cuba)

The project was addressed to the developing industrial center of Artemisa and included the engineering study, construction, and commissioning of compact substations for energy distribution and electrical equipment for the substation interconnection.

Show details

Wooden poles for public lighting

Havana (Cuba)

The project has included the study, working and supply of Sylvester Pine wooden poles from Scandinavia (Finland, Norway, Sweden).
They are 11 and 12 meters high and are treated with creosote: a material used to ensure long-lasting wood conservation.

Show details

PHOTOVOLTAIC SYSTEM FOR COFFEE ROASTERY

Artemisa (Cuba)

Design, construction, and commissioning of a rooftop photovoltaic system (PV) 168kWp including n. 594 solar panels 280kWp, n. 3 inverters 50kW, and low-voltage (LV) switchboards Euro-SDS 415/240V 60Hz, for the energy supply of a big coffee roastery, which has a production capacity of 1200 kg/h of ground and roasted Cuban coffee.

Show details

High-Voltage Electrical substation Cayo Santa Maria 13.8kV

Cayo Santa Maria (Cuba)

Design, construction and commissioning of a high-voltage (HV) electrical substation 13,8kV 2000A 25kA containing n. 22 air-insulated (AIS) medium-voltage (MV) Normal Clad switchgears 34,5kV 1250A 25kA, a low-voltage (LV) switchboard Euro-SDS 380/220V 60Hz, SCADA system for the control of the plant.

Show details

High-voltage electrical substation 34.5 kV

Isla de la Juventud (Cuba)

Design, construction and commissioning of a high-voltage (HV) electrical substation to supply electricity in the Cuban tourist area of the Isla de la Juventud.

Show details

EMPOWERMENT OF ARTEMISA PHOTOVOLTAIC SYSTEM 1.8MWP

Artemisa (Cuba)

Our engineers and technicians have studied, designed and assembled electrical equipment addressed to a rooftop photovoltaic system 1.8MWP in an industrial area in Artemisa (Cuba).

Show details

THE NEW BOULEVARD IN VARADERO

Varadero (Cuba)

The project consists of three E-Houses addressed to the new Varadero boulevard, in Cuba. It is located in one of the main arteries of the famous Cuban tourist center, where shops and restaurants will be able to carry out their business also thanks to the electricity grid implemented by the C.R. Technology Systems team.

Show details

LIGHTING SYSTEM FOR LUXURY HOTEL

Havana (Cuba)

The project has involved the design, construction and installation of the entire lighting system for the luxury Manzana de Gomez hotel, designed in European style by the architect José Gómez-Mena Vila, and its nearby street. The project has included LED lamps 3700K 90-295V AC 60Hz up to 36W IP65.

Show details

Compact substations for Steelwork application

Artemisa (Cuba)

The great project has included a 220/38.5kV electrical substation, designed for a steelwork.