projects

Show details

Public lighting 30/200/750 Lux

Havana – Plaza de la Revolución (Cuba)

The ambitious project, carried out in just three months and inaugurated on the occasion of the May 1, 2019 parade, guarantees a high energy-efficient lighting system in the stunning Plaza de la Revolucion.

Show details

Photovoltaic Plants 10MWp

Venegas, Matanzas, Camagüey, Mayajigua (Cuba)

The project includes 4 photovoltaic plants, with a total of 10MWp, located in 4 sites, situated in 3 different provinces of the Cuban Republic. It is part of the implementation plan of the Cuban economic development program, with the aim to reach a total of 700MW photovoltaic power supply by 2030.

Show details

Medium-Voltage (MV) Metal Clad Switchgears 6,3kV 1600A 40kA

Holguín (Cuba)

The project involves the supply of 30 medium voltage Metal Clad switchboards 12kV 1600A 40kA with a frequency of 60Hz and 6 low voltage SDS switchboards at the Lidio Ramon Perez thermoelectric plant, in Felton, in the province of Holguin.

Show details

ISO Container 34,5/0,48kV 630kVA

Havana (Cuba)

The project has involved the supply and installation of ISO containers 34,5/0,48kV 630kVA, for the oil plant in Havana.

Show details

High-Voltage (HV) Indoor Electrical Substation “Casco Histórico” 110/13.8kV

Varadero (Cuba)

This project has the peculiarity of being installed inside a building specifically designed, with the respect of the surrounding environment, notoriously recognized for its touristic value.

Show details

Equipment for a Medium-Voltage (MV) Electrical Substation 34,5kV 1250kVA

Artemisa (Cuba)

On the Cuban territory, in the province of Artemisa, has been carried out a project aimed to supply electric energy to the port area, well-known both for being a holiday destination and a business hub.

Show details

Medium-Voltage (MV) Metal Clad Switchgears 12kV 4000A 40kA

Antillana da Acero (La Havana)

The project consists of an electrical substation requalification work. It is placed inside the iron and steel complex in Antillana de Acero in La Havana

Show details

Retrofit of a High-Voltage (HV) Electrical Substation

Artemisa (Cuba)

The project consists of the renewal of high-voltage electrical substations previously designed and installed. The project is managed by the national authority for electricity.

Show details

IP65 Medium-Voltage (MV) Metal Clad Switchgears 17,5kV 400A 31,5kA 60Hz for Mining applications

Yauyos (Perù)

Outdoor installations of medium-voltage switchgears aimed to guarantee electricity to a company operating in the mining industry.

Show details

Medium-Voltage (MV) Metal Clad Switchgears 12kV 2500A 25kA

Santa Cruz de la Sierra, Andrés Ibáñez (Bolivia)

The ambitious project has been destined to a cement factory in Santa Cruz de la Sierra, in Andrés Ibáñez, the largest city in Bolivia.

Show details

Medium-Voltage (MV) Metal Clad Switchgears IP65 24 kV 630 A 31,5 kA for Mining application

Yauyos (Perù)

Carrying out of metal clad switchgears for mining applications.

Show details

The largest Rooftop Photovoltaic Plant in Cuba

Artemisa (Cuba)

The project has included the installation of four photovoltaic plants set on the roofs of four different warehouses.

Show details

Indoor Electrical substation 110/13,8kV

Palmeras (Cuba)

Construction of an electrical substation in Varadero, located in a structure designed to protect the equipment of high (HV) and medium voltage (MT) from the atmospheric conditions that characterize this geographical area.

Show details

Implementation of Electric Substations 34.5kv and 13.8kv

Artemisa (Cuba)

The project has involved the implementation of the supply of materials for the 34,5kV and 13,8kV electrical substations in the port area of Artemisa.

Show details

High-Voltage (HV) Electrical Substation 110/34.5kV

Puerto Escondido (Cuba)

The project involved the supply of material to increase the high voltage electrical substation (HV) in the development area of ​​the Petrolero, in the area of ​​Puerto Escondido.

Show details

Nr. 6 feed Pumps for the Thermoelectric Plant

Santa Cruz (Cuba)

The project includes 6 fuel pumps for the boiler of the thermal power plant of Santa Cruz, and various spare parts.

Show details

Supply of materials for an energy block in the National Centre

Artemisa (Cuba)

The project, carried out in the industrial cluster called “National Center” located in Artemisa, has consisted of the supply of materials, products and systems, for the installation of medium-voltage distribution shelters.

Show details

SUPPLY and LAYING of 100km High-Voltage Cable (AT) 123kV Underground for Interconnection of 3 Substation

Varadero - Palmeras (Cuba)

The project has seen the laying and start-up of a line cable 123kV with double circuit of 100km for the interconnection of high-voltage substations (HV) in the Varadero Casco Histórico and others high-voltage substations. The present installation has been carried out between the Casco Histórico and Palmeras.

Show details

High-Voltage (HV) Electrical Substation 34,5kV

Artemisa (Cuba)

The project has been carried out in the famous industrial center in Artemisa. It has included accessories for an electrical substation 34,5kV and the associated substation "Switching Center".

Show details

Renewing of the High-Voltage (HV) Electrical Substation 220/38/34,5/6kV

Havana (Cuba)

The project consists of the modernization of the Antillana de Acero electrical substation and it has been carried out in the Cotorro district of Havana, which has an essential function for the area as it supplies electricity to the "José Marti" steel plant.

Show details

Compact substations 34,5kV

Cayo Paredon Grande (Cuba)

Design, supply and implementation of the compact substations “Cayo Paredon - Anton čechov” and “Cayo Cruz” 34,5kV in the Cayo Paredon Grande area, located in the north of archipelago Cayo Romano, in Camagüey.

Show details

Reactors and Medium-Voltage (MV) Switchgears for electrical substations

Cayo Coco y Cayo Guillermo (Cuba)

Supply of materials and auxiliary accessories for the start-up of four reactors for the supply of electricity in the Cayería del Norte area in the province of Ciego de Ávila, a Cuban district.

Show details

Medium-Voltage (MV) Metal Clad duplex switchgears 24kV 1250A 25kA

Ciego de Avila (Cuba)

The medium-voltage switchgears allow to increase the supply of electrical energy produced by the substations of Cayo Coco y Guillermo, which are part of a project previously carried out.

Show details

Medium–Voltage 36kV switchgears of Secondary Distribution for the Expansion of the Electrical Substation

Artemisa (Cuba)

In the province of Artemisa, a highly inhabited Cuban region, have been implemented medium-voltage switchgears 36kV aimed to expand the electrical substation for the “Zal” logistics activity zone.

Show details

Led Public Lighting 160W for the “Avenida Primera”

Varadero (Cuba)

Lighting of the "Avenda Pirmera", the main artery of Varadero with which they cross all the streets, from no. 1 to n.69.

Show details

Supply of ATR-Ring and Euro P&C RMU

Artemisa (Cuba)

The project has included the supply of electrical materials and spare parts for the low-voltage switchgear Euro P&C RMU and medium-voltage metal-enclosed ATR-Ring switchgears, in order to guarantee the control of the electrical substation located the port area of Artemisa.

Show details

Cable for Interconnection of Substations: Varadero, Casco Histórico e Hicacos

Varadero, Hicacos (Cuba)

The project has seen the placement and implementation of the line cable 123kV with double circuit of 43km for the interconnection of high-voltage substations (HV) in the Varadero Casco Histórico and others high-voltage substations. The present installation has been carried out between the Casco Histórico and Hicacos.

Show details

Compact Substations STC-Box

Guacara e Tucacos (Venezuela)

The project was carried out in Guacara and Tucacas, tourist cities located in Venezuela. It has seen the implementation of several compact substations. These installations have been destined to Hyundai generator plants.

Show details

Medium-Voltage (MV) Normal Clad Switchgears 40.5kV 630A 16kA (3s) IP65

Chihuahua (Mexico)

Design, supply and implementation of electrical panels in Chihuahua, capital of the Mexican region of the same name.

Show details

Medium-Voltage (MV) Switchgears 6kV 2000A 25kA and spare parts for “10 de Octubre” Thermoelectric Power Station

Nuevitas (Cuba)

The project had been carried out in the tourist area of Nuevitas, in the province of Camagüey and it has included the renewal of the thermoelectric power station “10 October” in Nuevitas.

Show details

SCT-Box containing Medium-Voltage (MV) ATR Switchgears 24 kV 630 A 20 kA

Quito (Ecuador)

The project aims to increase the electrification grid in areas of Ecuador that suffer from a lack of electricity.

Show details

Metal-Enclosed ATR Switchgear 34.5 kV

Panama City (Panama)

The project was carried out in Panama City, with the aim of increasing the electrification grid.

Show details

Mobile Substation 115/13.8 kV 10 MVA

Aragua (Venezuela)

The project has involved the study and construction of a mobile substation 115/13.8kV 10MVA, with a frequency of 60Hz, with the aim of guaranteeing the supply of electricity in a rural area of Venezuela.