Supply of electrical equipment

Porto Alegre (Brasile)

Country

Brazil

Year

2015

Location
Products
Description

The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.

The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.

Related projects

Medium-Voltage (MV) Normal Clad Switchgears IP65 40,5kV 630A 16kA (3s)

Chihuahua (Mexico)

Design, supply and implementation of metal-clad electrical panels in a mining company in Chihuahua.

Retrofit of MV Circuit-breakers 1250A / 2500A / 4000A

Best (Holland)

The retrofit project of medium-voltage (MV) circuit-breakers was addressed to n. 12 primary distribution plants and run by one of the leading companies in the electricity distribution field in the south of the Netherlands.