Supply of electrical equipment

Porto Alegre (Brasile)

Country

Brazil

Year

2015

Description

The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.

The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.

Related projects

MV Switchgears 6kV 2500/1250A 25kA for Thermoelectric Plant

Nuevitas (Cuba)

The project has included engineering, construction and supply of an electrical substation with medium-voltage Normal Clad switchgears for the electrification of a thermoelectric power station.

MV E-House 36kV for electrical grid

Tripoli (Libya)

The project has included the design and construction of n. 3 compact STC-Box substations, aiming to increase electrification in Libya.