The project was carried out in Panama City, with the aim of increasing the electrification grid.

The project has included the study, construction and supply of Metal-Enclosed ATR Switchgears 34.5kV with a frequency of 60Hz.

Related projects

Supply of materials for an energy block in the National Centre

Artemisa (Cuba)

The project, carried out in the industrial cluster called “National Center” located in Artemisa, has consisted of the supply of materials, products and systems, for the installation of medium-voltage distribution shelters.

Mobile Substation 115/13.8 kV 10 MVA

Aragua (Venezuela)

The project has involved the study and construction of a mobile substation 115/13.8kV 10MVA, with a frequency of 60Hz, with the aim of guaranteeing the supply of electricity in a rural area of Venezuela.