N. 61 Transformation cabins for the electrical grid
Havana (Cuba)
Country
Year
Description
The ambitious realization has the aim of increasing the electric grid in the Cuban capital.
The project has involved the carrying out and start-up of the following transformation centers with radial conjugation:
- Nr. 3 STC-Kiosk 24 13.8kV 100kVA nominal voltages on low-voltage side 220V
- Nr. 10 STC-Kiosk 24 13.8kV 150kVA nominal voltages on low-voltage side 480V
- Nr. 5 STC-Kiosk 36 34.5kV 150kVA nominal voltage on low-voltage side 480V
- Nr. 1 STC-Kiosk 24 13.8kV 500kVA nominal voltages on low-voltage side 220V
- Nr. 1 STC-Kiosk 24 13.8kV 500kVA nominal voltages on low-voltage side 415V
- Nr. 2 STC-Kiosk 24 13.8kV 400kVA nominal voltages on low-voltage side 220V
- Nr. 3 STC-Kiosk 24 13.8kV 400kVA nominal voltages on low-voltage side 480V
- Nr. 11 STC-Kiosk 36 13.8kV 500kVA nominal voltages on low-voltage side 220V
- Nr. 1 STC-Kiosk 36 34.5kV 750kVA nominal voltages on low-voltage side 415V
- Nr. 3 STC-Kiosk 36 34.5kV 1500kVA nominal voltages on low-voltage side 415V
Related projects to Transformation cabin
N. 3 MV Transformation cabins 13.8kV for the new boulevard in Varadero
Varadero (Cuba)
The project consists of three transformation cabins addressed to the new Varadero boulevard, in Cuba. It is located in one of the main arteries of the famous Cuban tourist center, where shops and restaurants will be able to carry out their business also thanks to the electricity grid implemented by the C.R. Technology Systems team.
Renewable for Africa – Ivory Coast
Abidjan (Ivory Coast)
The project was carried out thanks to the donation offered to the government of the Ivory Coast, to provide power to a photovoltaic system, used for the extraction and purification of groundwater.