Cable for Interconnection of Substations: Varadero, Casco Histórico e Hicacos

Varadero (Cuba)

Description

The project has seen the laying and set up of the line cable 123kV with double circuit of 43km for the interconnection of high-voltage substations (HV) in the Varadero Casco Histórico and other high-voltage substations. The present installation has been carried out between the Casco Histórico and Hicacos.

The necessary equipment has been installed for the start-up of the cable line 123kV, for the interconnection of high-voltage substations (HV)

Related projects

N. 12 Skid transformation cabins for photovoltaic system

Trévago (Spain)

N. 12 transformation cabins STC-Skid 6MVA 30/0,8-0,8kV for a photovoltaic system in Spain.

Medium-Voltage (MV) Normal Clad Switchgears IP65 40,5kV 630A 16kA (3s)

Chihuahua (Mexico)

Design, supply and implementation of metal-clad electrical panels in a mining company in Chihuahua.