MV Mobile Substation 23kV
Asunción (Paraguay)
Country
Year
Location
Solutions
Products
Description
Study, design, construction of a mobile substation 23kV composed of two trailers, 17 m each. It will be used for the extension of the electrical substation, and emergency and maintenance needs, in Paraguay.
Equipment mounted on the first trailer:
- STC-Box shelter, with electric automation system for opening and closing of the cabin doors
- Medium-voltage (MV) air-insulated (AIS) Normal Clad switchgear (n. 9 cubicles) 24kV 2500A 25kA, equipped with control, protection, and alarming sensors. The electrical switchgear is designed to work both as an independent unit and connected with the main substation system
- Low-voltage (LV) switchboards Euro SDS
- Current and voltage transformers
- Earthing knife switch
- Protection relays
- SCADA system for the remote monitoring
- With accessories needed to guarantee the integrity of the equipment during the transport, against vibrations
- Insulated cables 23kV
- Hydraulic power unit
- Automatic cable reels hydraulic operated
Related projects to SCADA Solution
N. 4 switching station and n. 1 control room for BESS
Cernay-lès-Reims (France)
Installation will feature 240MW/480MWh of storage capacity and will be connected to the 225kV RTE national grid.
HV/MV Mobile substation 115/37.5/10.5kV 10MVA
Udënisht, Korçë (Albania)
The project has included design, installation and supply of a mobile substation in Udënisht, a well-known touristic area, in Korçë, and the sixth most important town in Albania.
