N. 4 switching station and n. 1 control room for BESS
Cernay-lès-Reims (France)
Country
Year
Location
Solutions
Products
Description
Installation will feature 240MW/480MWh of storage capacity and will be connected to the 225kV RTE national grid.
The project contributes to France’s largest Battery Energy Storage System (BESS) and is designed to store enough energy to cover 20% of the residential electricity needs of the Marne department (≈565,000 residents) and will play a key role in stabilizing the grid as renewable energy penetration increases.
It includes the study, deign, manufacturing and delivery of n. 4 switching station and n. 1 control room.
The equipment includes:
- MV switchgear ATR 33kV 2500A 25kA(1s)
- LV switchboard
- Patch panel
- HV bus and interface protection panel Euro-P&C
- Fire detection system
- HVAC
- UPS and rectifier
- 4G antenna, weather station, GPS, Swicom
- SCADA panels
- Roxtech
Related projects to eHouse
Switchroom and TSO for BESS in France
Cheviré, Nantes (France)
Our eHouse is destined to the largest Battery Energy Storage Systems (BESS) ever built, in the Port of Nantes Saint-Nazaire.
EHOUSE 36kV 42MW BESS PLANT
Hyde (United Kingdom)
We have delivered our eHouse, STC-Box 33kV type, addressed to a Battery Energy Storage System, located in Hyde (UK).