MV Transformation cabin 34.5/0.48kV for oil plant

Havana (Cuba)

Country

Cuba

Year

2018

Description

The project has involved the supply and installation of ISO containers 34,5/0,48kV 630kVA, for the oil plant in Havana.

On Friday 4th October 2019 it has been inaugurated the first horizontal drilling well, which constitutes a joint project between the Eurasian country and Cuba. The plant has also included our ISO container 34,5/0,48kV 630kVA, containing medium-voltage (MV) ATR-Ring switchgear 4,5kV 630A 16kA.
Concerning this project, the peculiarity of this solution is the automatic ventilation system of the transformer room, which allows coping with the tropical climate typical of the Caribbean area.

Related projects to Transformation cabin

TRANSFORMATION CABIN 34,5kV 1500kVA FOR DEVELOPMENT AREAS  

Artemisa (Cuba)

Design, manufacturing and commissioning of compact transformation cabin, STC-Kiosk, 1500kVA 34,5kV /400-230V for a Vietnamese client addressed to the new production line of a hygiene factory in the development area of Artemisa province, Cuba.

N. 4 TRANSFORMATION CABINS FOR PHOTOVOLTAIC SYSTEM 3.15MVA

Viterbo (Italy)

Design, manufacturing and supply of nr. 4 modular and plug-in Solar Stations, STC-Kiosk, for the photovoltaic system in Viterbo, Italy.