STC-SKID transformation cabins 6MVA et 4MVA
Bucharest (Romania)
Country
Year
Location
Solutions
Products
Description
Design, manufactoring and commissioning of n. 3 STC-Skid plug-in substations for a photovoltaic system in Romania.
The compact substations are designed as follow:
- N. 2 STC-Skid 6MVA/2MV 20kV
- N. 1 STC-Skid 4MVA/2MV 20kV
By integrating these Skid Cabins into the photovoltaic system, we are truly connecting the power and driving forward the green energy development.
Related projects to Transformation cabin
CONTROL ROOM EHOUSE FOR BESS 100MW 200MWh
North Yorkshire (United Kingdom)
We designed, constructed and supplied an eHouse control room, carried out for Tesla and addressed to the Lakeside Battery Energy Storage System, in Drax, North Yorkshire (UK).
Skid transformation cabin 36kV 4.4MVA
Trino Vercellese (Italy)
We have designed, manufactured and carried out the commissioning of STC-Skid transformer substations destined for the Trino Vercellese photovoltaic plant.