STC-SKID transformation cabins 6MVA et 4MVA
Bucharest (Romania)
Country
Year
Location
Solutions
Products
Description
Design, manufactoring and commissioning of n. 3 STC-Skid plug-in substations for a photovoltaic system in Romania.
The compact substations are designed as follow:
- N. 2 STC-Skid 6MVA/2MV 20kV
- N. 1 STC-Skid 4MVA/2MV 20kV
By integrating these Skid Cabins into the photovoltaic system, we are truly connecting the power and driving forward the green energy development.
Related projects to Transformation cabin
STC-Skid transformation cabins 20kV
Rovigo (Italy)
The project consists of n. 6 STC-Skid transformation cabins 7.2MW addressed to a photovoltaic system in Rovigo (Italy).
ISO Container for oil plant
Sirte Bay (Libya)
The project is designed for an oil plant extraction in Libya. It consists of an IP65 ISO container, equipped with an LV switchboard, LV MCC (Motor Control Center), UPS system, HVAC system, LV transformer 480/400VAC, and fire fighting system.