MV E-House 20kV for photovoltaic plant

Cipollaretta (Italy)

Country

Italy

Year

2021

Description

Design and construction of an E-House, for the Alzo electrical substation, carried out by our Sister Company C.R. Project Service. It is connected to the largest photovoltaic system in the Viterbo area and occupies 101 hectares in the Cipollaretta area.

The photovoltaic system has a power of 89.5 MWp and is connected to the national grid.
Our compact electrical substation STC-Box is equipped with:

  • N. 7 medium-voltage (MT) air-insulated (AIS) cubicles ATR 20kV 2500A 25kA
  • Low-voltage panels (LV)
  • Protection panels
  • SCADA system
  • Auxiliary transformer
  • HVAC systems
  • Auxiliary equipment

Related projects to eHouse

eHouse 33kV for BESS in Lancashire

Chorley (United Kingdom)

Design, construction and delivery of an eHouse destined to the BESS systems connected to a photovoltaic plant in Chorley, Lancashire (UK), with the aim of powering the local grid.

HV/MV Mobile Substation 69-34.5/13.8-11.95kV 30MVA

Rio de Janeiro (Brazil)

This important project includes the study, design, construction and supply of a mobile substation 69-34,5/13,8-11,95kV 30MVA for Enel Group, addressed to Rio de Janeiro (Brazil).