STC-Skid transformation cabins 4,8MVA
Padua (Italy)
Country
Year
Location
Solutions
Products
Description
Design, manufacturing and commissioning of plug-in Skid transformation cabins destined for a photovoltaic plant in the beautiful location of Monselice (Padua).
In detail, the project includes n. 2 Skid cabins 4,8MVA, equipped with MV switchgear ATR-Ring 24kV 630A 16kA, MV/LV oil-transformer, LV/LV auxiliary transformer, low-voltage switchboard Euro PC, UPS panels, AUX panels.
Related projects to Transformation cabin
CONTROL ROOM EHOUSE FOR BESS 100MW 200MWh
North Yorkshire (United Kingdom)
We designed, constructed and supplied an eHouse control room, carried out for Tesla and addressed to the Lakeside Battery Energy Storage System, in Drax, North Yorkshire (UK).
STC-Skid transformation cabins 20kV
Rovigo (Italy)
The project consists of n. 6 STC-Skid transformation cabins 7.2MW addressed to a photovoltaic system in Rovigo (Italy).