STC-Skid transformation cabins 4,8MVA
Padua (Italy)
Country
Year
Location
Solutions
Products
Description
Design, manufacturing and commissioning of plug-in Skid transformation cabins destined for a photovoltaic plant in the beautiful location of Monselice (Padua).
In detail, the project includes n. 2 Skid cabins 4,8MVA, equipped with MV switchgear ATR-Ring 24kV 630A 16kA, MV/LV oil-transformer, LV/LV auxiliary transformer, low-voltage switchboard Euro PC, UPS panels, AUX panels.
Related projects to Transformation cabin
EHouse and n. 4 transformation cabins for Photovoltaic plant
Macchiareddu (Italy)
Project realised in Macchiareddu, within a photovoltaic park in Sardinia in one of the most important industrial hubs. This is an area of development increasingly powered by alternative energy, where CR Technology Systems has already been present for some years in the realisation of green projects in the area.
Skid transformation cabin 36kV 4.4MVA
Trino Vercellese (Italy)
We have designed, manufactured and carried out the commissioning of STC-Skid transformer substations destined for the Trino Vercellese photovoltaic plant.