Design, manufacturing and delivery of n. 4 switchrooms and n. 1 control room for Battery Energy Storage System - BESS, in Norwich (UK).

The project, located alongside the onshore infrastructure of the Hornsea 3 Offshore Wind Farm near Norwich, is one of the largest battery systems in Europe, with a power rating of 300 MW and an energy capacity of 600 MWh (around two hours of nominal duration). It also shares its grid connection with the offshore wind farm, further improving overall efficiency. Our scope included 4 Medium Voltage Switchrooms 33kV, 2000A, 31.5kA(3s) and 1 Control Room, equipped with:

  • 36 kV MV panels
  • LV panels for protection and monitoring
  • Patch panels & Roxtec cabling systems
  • 4G antenna, weather station, GPS
  • Swicom
  • Fire detection system
  • HVAC
  • Human interface panels

Related projects to eHouse

EHouse and n. 4 transformation cabins for Photovoltaic plant

Macchiareddu (Italy)

Project realised in Macchiareddu, within a photovoltaic park in Sardinia in one of the most important industrial hubs. This is an area of development increasingly powered by alternative energy, where CR Technology Systems has already been present for some years in the realisation of green projects in the area.

Elevating substation 0.44/13.8-11.4kV for generators 

Rio de Janeiro (Brazil)

For Enel Brazil, we have designed, manufactured and supplied an elevating substation 0.44/13.8-11.4kV with advanced coupling systems for generators addressed to Rio de Janeiro.