N. 3 e-Houses for Gallitello substation 30/220kV

Gibellina (Italy)

Country

Italy

Year

2026

Description

Design, manufacturing and supply of n. 3 switchrooms for Gallitello connection substation 30/220kV in Gibellina area. It is an essential element for strengthening the region’s energy resilience and integrating renewable energy sources into the Sicilian national transmission grid.

The project includes the installation of n. 3 connection-ready Switchrooms, designed to operate in challenging environments and equipped with:

  • Medium-voltage electrical switchgears ATR 36kV 2500A 25kA;
  • Low-voltage switchboards Euro-SDS and SCADA system for real-time monitoring;
  • Protection and control panels, UPS systems, batteries, and 100kVA auxiliary transformers to ensure 24/7 operability;
  • Integrated HVAC systems for temperature control in technical rooms housing critical equipment.
The infrastructure enables the transformation and connection between the 30kV collection grid and the national transmission grid, accelerating the energy transition toward a more sustainable future.

Related projects to eHouse

MV E-House 17.5kV for floating solar plant

Alqueva (Portugal)

Study, design, and construction of an IP54 2×2.5MVA E-House, STC-Box, destined for the floating solar system in Alqueva, Portugal.

MV E-House 20kV for Tesla Battery Energy Storage System

West Sussex (United Kingdom)

Engineering study, design, construction, and supply of n. 1 compact substation STC-Box for a Tesla project in West Sussex (UK).