Description

Construction of the electrical system of a hydroelectric plant in Shpellë. Hydroelectric energy is based on the conversion of natural water flow into electricity and is classified as renewable energy because it is generated by exploiting the kinetic force given by the natural water cycle.

The project consists of metal-enclosed medium-voltage ATR switchgears 12kV 630A 16kA, a power transformer 4.7MVA, an auxiliary transformer 160kVA 6.3/0.4kV, a protection and control panel, a low-voltage (LV) panel AC/DC, high-voltage (HV) circuit breakers, disconnectors, current transformer and voltage transformer (TA/TV), surge arrester, battery system.

Related projects to Electrical substation

HV/MV Substation 110/20kV 25MVA

Durrës (Albania)

Design, construction, installation and commissioning of electrical equipment for the high-voltage to medium-voltage substation HV/MV, connected to a hydro power plant.

N.2 HV/MV Substations 110/7.3kV 8MVA

Çemericë, Korçë (Albania)

The project has seen the implementation of 2 high-voltage to medium-voltage electrical substations in Çemericë and Korçë.