eHouses for 50MW/100MWh BESS plant
Hilbesheim
Country
Year
Description
Design, manufacturing and supply of a switchroom and a control room for the 50MW/100MWh Battery Energy Storage System destined to La Sarre, in Hilbesheim (France).
The project includes the study, design, manufacturing and supply of:
- N. 1 Switchroom, equipped with n. 6 MV air-insulated (AIS) ATR switchgear panels 36kV, HVAC system, LV switchboard, fire detection system, UPS and rectifier, patch panel, 4G antenna, weather station, swicom, auxiliary equipment.
- N. 1 TSO control room, equipped with HVAC system, LV switchboard, fire detection system, UPS and rectifier, HV protection panels, network interface rack, human interface rack, auxiliary equipment.
Moreover, throughout its entire operating lifetime, it’ll help avoid nearly 180,000 tonnes of CO₂ equivalent. This project is part of a series of investments that will contribute to France’s 2050 carbon neutrality target.
Related projects to eHouse
MV E-HOUSE 33kV 20MVA FOR BESS
Surrey (United Kingdom)
Design, manufacturing and commissioning of Switching station STC-Box 33kV 20MVA, designed for the BESS plant 20 MW/40 MWh in Farnham, Surrey (UK).
MV E-House 20kV for Tesla Battery Energy Storage System
West Sussex (United Kingdom)
Engineering study, design, construction, and supply of n. 1 compact substation STC-Box for a Tesla project in West Sussex (UK).