We have designed, constructed, and supplied an eHouse STC-Box for the Battery Energy Storage System (BESS), in the UK.

Plug-in compact substation, equipped with MV air-insulated switchgear ATR 36kV 1250A 25kA(1s), LV switchboard 400/230V, patch panel, HV transformer protection panels, HVAC system, UPS battery and rectifier, fire detection system, auxiliary equipment.
Our team collaborated synergistically to achieve the best possible engineering design and technological features, drawing on the large experience of each member. Through meticulous planning and execution, we ensured an efficient and safe plant, as confirmed by the successful FAT tests.

Related projects to eHouse

eHouse 33kV for BESS in Lancashire

Chorley (United Kingdom)

Design, construction and delivery of an eHouse destined to the BESS systems connected to a photovoltaic plant in Chorley, Lancashire (UK), with the aim of powering the local grid.

MV E-House 20kV for photovoltaic plant

Cipollaretta (Italy)

Design and construction of an E-House, for the Alzo electrical substation, carried out by our Sister Company C.R. Project Service. It is connected to the largest photovoltaic system in the Viterbo area and occupies 101 hectares in the Cipollaretta area.