HV/MV Substation 115/6.3kV 4.7MVA
Shpellë (Albania)
Country
Year
Location
Solutions
Products
Description
Construction of the electrical system of a hydroelectric plant in Shpellë. Hydroelectric energy is based on the conversion of natural water flow into electricity and is classified as renewable energy because it is generated by exploiting the kinetic force given by the natural water cycle.
The project consists of metal-enclosed medium-voltage ATR switchgears 12kV 630A 16kA, a power transformer 4.7MVA, an auxiliary transformer 160kVA 6.3/0.4kV, a protection and control panel, a low-voltage (LV) panel AC/DC, high-voltage (HV) circuit breakers, disconnectors, current transformer and voltage transformer (TA/TV), surge arrester, battery system.
Related projects to Electrical substation
Electrical installation works for industrial plant
Pieve Vergonte (Italy)
The project has included the works to expand the high-voltage (HV) electrical substation serving the Hydrochem Srl plant in Pieve Vergonte (Piedmont).
N.2 HV/MV Substations 110/7.3kV 8MVA
Çemericë, Korçë (Albania)
The project has seen the implementation of 2 high-voltage to medium-voltage electrical substations in Çemericë and Korçë.
