Supply of Electrical Materials for a Photovoltaic Plant

Areza (Eritrea)

Country

Eritrea

Year

2018

Location
Products
Description

The project has been implemented in Areza, a rural area in the south of Eritrea, aimed to supply electrical material for a photovoltaic plant.

It has been installed:

  • 13 voltage transformers 200kVA 15000/400/240V;
  • 21 voltage transformers 100kVA 15000/415/240V;
  • 26 voltage transformers 50kVA 15000/415/240V;
  • 30 voltage transformers 25kVA 15000/415/240V.
In addition, the project has included over n. 6000 circuit breakers, n. 170 disconnectors and various types of cables and connectors. The n. 2 viallges in Aresa and Maidma have been interconnected to n. 2 photovoltaic plants of total power 2.7MWp.

Related projects

MV E-House 20kV for Tesla Battery Energy Storage System

West Sussex (United Kingdom)

Engineering study, design, construction, and supply of n. 1 compact substation STC-Box for a Tesla project in West Sussex (UK).

SCADA System for the Control and Management of the Plant

Zarzouna (Tunisia)

The project, destined for the city of Zarzouna, in the Tunisian province of Biserta, has seen the supply and implementation of technological remote control and management devices. The system consists of various measuring and management devices that interface with the SCADA system for a generator plant.