Supply of Electrical Materials for a Photovoltaic Plant
Areza (Eritrea)
Country
Year
Description
The project has been implemented in Areza, a rural area in the south of Eritrea, aimed to supply electrical material for a photovoltaic plant.
It has been installed:
- 13 voltage transformers 200kVA 15000/400/240V;
- 21 voltage transformers 100kVA 15000/415/240V;
- 26 voltage transformers 50kVA 15000/415/240V;
- 30 voltage transformers 25kVA 15000/415/240V.
Related projects
Energy and agriculture in synergy with our eHouse
Montalto di Castro (Italy)
We have studied, designed, manufactured and supplied a connection cabin, eHouse, intended for the Guinza Grande plant in Montalto di Castro, Viterbo.
Lighting system
Capo Bon, Korba, Sbikha, Sbeitla e Feriana di Scogat (Tunisia)
The project has included the dismantling of old lighting fixtures and the installation of more technological lamps, aimed at optimizing the lighting system in the areas of Capo Bon, Korba, Sbikha, Sbeitla and Feriana of Scogat, in Tunisia.
