Supply of Electrical Materials for a Photovoltaic Plant

Areza (Eritrea)

Country
Year

2018

Location
Products
Description

The project has been implemented in Areza, a rural area in the south of Eritrea, aimed to supply electrical material for a photovoltaic plant.

It has been installed:

  • 13 voltage transformers 200kVA 15000/400/240V;
  • 21 voltage transformers 100kVA 15000/415/240V;
  • 26 voltage transformers 50kVA 15000/415/240V;
  • 30 voltage transformers 25kVA 15000/415/240V.
In addition, the project has included over n. 6000 circuit breakers, n. 170 disconnectors and various types of cables and connectors. The n. 2 viallges in Aresa and Maidma have been interconnected at n. 2 photovoltaic plants of total power 2.7MWp.

Related projects

STC-BOX SHELTER FOR LYBIA PROJECT

Nafoora (Lybia)

The project includes the design, construction, and commissioning of a compact and modular substation STC-Box and it is addressed to an oil plant in Nafoora, Sirte Bay, in Lybia.

High-Voltage (HV) Electrical Substation 110/34.5kV

Puerto Escondido (Cuba)

The project has involved the supply of material to increase the high-voltage electrical substation (HV) in the developing area of ​​Petrolero, in Puerto Escondido district.