eHouse for BESS in Lincolnshire

Lincolnshire (Regno Unito)

Country

Regno Unito

Year

2025

Description

Project designed to improve the energy infrastructure in the UK: supply of a fully equipped 33kV switchroom STC-Box for a Battery Energy Storage System (BESS) located in Grimsby, Lincolnshire.

The eHouse is equipped with:

  • MV air-insulated switchgear ATR 36kV 1250A 25kA(1s), 4 panels (1 incomer cubicle +3 outgoing cubicles)
  • 110 VDC System with Battery
  • HVAC system
  • Fire Detection system
  • AUX LV Switchboard
  • MV SCADA system
Designed for high performance and reliability, this plug-in compact substation ensures efficient energy management and operational safety.
This project marks another important milestone in our journey to strengthen our presence in the UK market, where we are currently focused on expanding our footprint and delivering innovative, sustainable solutions that support the country’s energy transition.

Related projects

MV E-House 13.8kV for electrical grid

Puerto Cabello (Venezuela)

The project has included modular shelters and medium and low-voltage switchgears, for the modernization of generators in Venezuela.

Retrofit of Medium-voltage (MV) circuit-breakers 800A

Dalmine - Bergamo (Italy)

For the realization of the project, the engineering hub has applied a reverse engineering study, starting from the existing plant, to develop an operational and suitable product.