eHouse for BESS in Lincolnshire

Lincolnshire (Regno Unito)

Country

Regno Unito

Year

2025

Description

Project designed to improve the energy infrastructure in the UK: supply of a fully equipped 33kV switchroom STC-Box for a Battery Energy Storage System (BESS) located in Grimsby, Lincolnshire.

The eHouse is equipped with:

  • MV air-insulated switchgear ATR 36kV 1250A 25kA(1s), 4 panels (1 incomer cubicle +3 outgoing cubicles)
  • 110 VDC System with Battery
  • HVAC system
  • Fire Detection system
  • AUX LV Switchboard
  • MV SCADA system
Designed for high performance and reliability, this plug-in compact substation ensures efficient energy management and operational safety.
This project marks another important milestone in our journey to strengthen our presence in the UK market, where we are currently focused on expanding our footprint and delivering innovative, sustainable solutions that support the country’s energy transition.

Related projects

Protection panels for Electrical Substation

Croydon (United Kingdom)

The project, carried out in the city of Croydon, a metropolitan center located in south of London, has included the supply of two protection and control panels, the materials and accessories needed for the putting into service. Everything was addressed to an electrical substation 34.5kV 24Vdc with a frequency of 60Hz.

N. 4 Power Transformers 40.7MVA in total

Tiranë (Albania)

The project has been carried out in Albania, in collaboration with the local company OSHEE.