Protection panels for Electrical Substation
Croydon (United Kingdom)
Country
Year
Description
The project, carried out in the city of Croydon, a metropolitan center located in south of London, has included the supply of two protection and control panels, the materials and accessories needed for the putting into service. Everything was addressed to an electrical substation 34.5kV 24Vdc with a frequency of 60Hz.
Related projects
Retrofit of Medium-voltage (MV) circuit-breakers 800A
Dalmine - Bergamo (Italy)
For the realization of the project, the engineering hub has applied a reverse engineering study, starting from the existing plant, to develop an operational and suitable product.
Skid transformation cabin 36kV 4.4MVA
Trino Vercellese (Italy)
We have designed, manufactured and carried out the commissioning of STC-Skid transformer substations destined for the Trino Vercellese photovoltaic plant.
