Our eHouse for BESS in Lincolnshire

Lincolnshire (United Kingdom)

Country

United Kingdom

Year

2025

Description

We projected, manufactured and supplied a switchroom, designed to improve the energy infrastructure in the UK: the supply of a fully equipped 33kV Switchroom STC-Box for a Battery Energy Storage System (BESS) located in Grimsby, Lincolnshire.

  • MV air-insulated switchgear ATR 36kV 1250A 25kA(1s), 4 panels (1 incomer cubicle +3 outgoing cubicles)
  • 110 VDC System with Battery
  • HVAC
  • Fire Detection system
  • AUX LV Switchboard
  • MV SCADA system
Designed for high performance and reliability, this plug-in compact substation ensures efficient energy management and operational safety.
This project marks another important milestone in our journey to strengthen our presence in the UK market, where we are currently focused on expanding our footprint and delivering innovative, sustainable solutions that support the country’s energy transition.

Related projects to eHouse

MV E-House 34.5kV for oil plant

Sirte Bay (Libya)

Extension of the electrical substation serving the oil plant in Nafoora, at Sirte Bay. The project involves the design, construction, and supply of 34.5kV, 4.16kV and 480V compact and modular plug-in substations.

HV/MV Mobile substation 115/37.5/10.5kV 10MVA

Udënisht, Korçë (Albania)

The project has included design, installation and supply of a mobile substation in Udënisht, a well-known touristic area, in Korçë, and the sixth most important town in Albania.