N. 4 MV switchrooms 33kV and 1 control room for BESS
Norwich (United Kingdom)
Country
Year
Description
We have designed, manufactured and supply Ørsted’s first large-scale Battery Energy Storage System (BESS) in the UK.
The project, co-located with the Hornsea 3 Offshore Wind Farm onshore infrastructure near Norwich, will be among the largest battery systems in Europe:
- Power rating: 300 MW
- Energy capacity: 600 MWh (≈ 2 hours nominal duration)
- Shared grid connection with offshore wind for optimized efficiency
- MV AIS switchgear 36kV
- LV panels for protection and monitoring
- Patch panels & Roxtec cabling systems
- 4G antenna, weather station, GPS
- Swicom
- Fire detection system
- HVAC
- Human interface panels
Related projects to eHouse
eHOUSE: the smart solution for energy distribution
Latin America
We have designed and manufactured n. 5 compact plug-in substations for MV and LV electricity distribution at a territorial level, primarily designed for hotel facilities. The cabins are part of a unified MV distribution system with a double-ring configuration.
MV E-HOUSE 33kV 20MVA FOR BESS
Surrey (United Kingdom)
Design, manufacturing and commissioning of Switching station STC-Box 33kV 20MVA, designed for the BESS plant 20 MW/40 MWh in Farnham, Surrey (UK).