N. 4 MV switchrooms 33kV and 1 control room for BESS
Norwich (United Kingdom)
Country
Year
Description
We have designed, manufactured and supply Ørsted’s first large-scale Battery Energy Storage System (BESS) in the UK.
The project, co-located with the Hornsea 3 Offshore Wind Farm onshore infrastructure near Norwich, will be among the largest battery systems in Europe:
- Power rating: 300 MW
- Energy capacity: 600 MWh (≈ 2 hours nominal duration)
- Shared grid connection with offshore wind for optimized efficiency
- MV AIS switchgear 36kV
- LV panels for protection and monitoring
- Patch panels & Roxtec cabling systems
- 4G antenna, weather station, GPS
- Swicom
- Fire detection system
- HVAC
- Human interface panels
Related projects to eHouse
CONTROL ROOM EHOUSE FOR BESS 100MW 200MWh
North Yorkshire (United Kingdom)
We designed, constructed and supplied an eHouse control room, carried out for Tesla and addressed to the Lakeside Battery Energy Storage System, in Drax, North Yorkshire (UK).
MV E-House 35/20/10kV for industrial district
Peshkopi (Dibër) - Albania
Design, construction and supply of a medium-voltage (MV) compact substation in Peshkopi, industrial area of the Albanian city Dibër.
