N. 4 MV switchrooms 33kV and 1 control room for BESS
Norwich (United Kingdom)
Country
Year
Description
We have designed, manufactured and supply switchrooms for the Ørsted’s first large-scale Battery Energy Storage System (BESS) in the UK.
The project, co-located with the Hornsea 3 Offshore Wind Farm onshore infrastructure near Norwich, will be among the largest battery systems in Europe:
- Power rating: 300 MW
- Energy capacity: 600 MWh (≈ 2 hours nominal duration)
- Shared grid connection with offshore wind for optimized efficiency
- MV AIS switchgear 36kV
- LV panels for protection and monitoring
- Patch panels & Roxtec cabling systems
- 4G antenna, weather station, GPS
- Swicom
- Fire detection system
- HVAC
- Human interface panels
Related projects to eHouse
eHouse for 96MVA photovoltaic plant
Lamezia Terme (Italy)
96MVA photovoltaic plant in Lamezia Terme, with the supply of an integrated medium-voltage solution.
N.2 MV E-House 33kV 50MVA for Tesla Battery Energy Storage System
Yorkshire (United Kingdom)
Design, construction and supply of n. 2 switching stations equipped with power transformers, MV air-insulated ATR switchgear 36kV 1250A 20kA (1s), LV switchboards, and a SCADA system for the remote control, destined to Tesla BESS (Battery Energy Storage System).