N. 4 MV switchrooms 33kV and 1 control room for BESS
Norwich (United Kingdom)
Country
Year
Description
We have designed, manufactured and supply switchrooms for the Ørsted’s first large-scale Battery Energy Storage System (BESS) in the UK.
The project, co-located with the Hornsea 3 Offshore Wind Farm onshore infrastructure near Norwich, will be among the largest battery systems in Europe:
- Power rating: 300 MW
- Energy capacity: 600 MWh (≈ 2 hours nominal duration)
- Shared grid connection with offshore wind for optimized efficiency
- MV AIS switchgear 36kV
- LV panels for protection and monitoring
- Patch panels & Roxtec cabling systems
- 4G antenna, weather station, GPS
- Swicom
- Fire detection system
- HVAC
- Human interface panels
Related projects to eHouse
eHouse for BESS in Serramanna station
Cagliari (Italy)
We have designed and manufactured a switchroom that will manage the power distribution from a 40MW photovoltaic plant and a 17MW BESS system on a surface of 51 hectares at Serramanna station in Cagliari.
N. 4 MV E-Houses 23kV for electrification of rural areas
Gonaives e Cabo Haitiano (Haiti)
The project has included n. 4 compact substations, with the aim to supply the electricity in the rural areas of Gonaives and Cabo Haitiano.