N. 4 switching station and n. 1 control room for BESS

Cernay-lès-Reims (France)

Country

Francia

Year

2025

Description

Installation will feature 240MW/480MWh of storage capacity and will be connected to the 225kV RTE national grid.

The project contributes to France’s largest Battery Energy Storage System (BESS) and is designed to store enough energy to cover 20% of the residential electricity needs of the Marne department (≈565,000 residents) and will play a key role in stabilizing the grid as renewable energy penetration increases.
It includes the study, deign, manufacturing and delivery of n. 4 switching station and n. 1 control room. The equipment includes:

  • MV switchgear ATR 33kV 2500A 25kA(1s)
  • LV switchboard
  • Patch panel
  • HV bus and interface protection panel Euro-P&C
  • Fire detection system
  • HVAC
  • UPS and rectifier
  • 4G antenna, weather station, GPS, Swicom
  • SCADA panels
  • Roxtech

Related projects to eHouse

eHouse 36kV for BESS in Scotland

Fife (Scotland)

The Little Raith Battery Energy Storage System (BESS) is a significant project located in Fife, Scotland.

N. 7 MV E-Houses 24kV for generator plants

Guacara e Tucacos (Venezuela)

The project was carried out in Guacara and Tucacas, tourist cities located in Venezuela. It has seen the implementation of several compact substations, destined to Hyundai generator plants.