These are the first n. 2 mobile substations designed and realized by C.R. Technology Systems S.p.A. and are used to provide electricity to remote areas of Basra.
The project has included n. 2 mobile substations 110/33kV 16MVA, that consist of 2 trailers each, carrying a modular shelter that includes medium-voltage (MV) Normal Clad switchgears 33kV 1250A 31,5kA (1s), power transformer, n. 2 DC systems (UPS and batteries), disconnectors, SCADA system, 3-phase 145kV lightening arrestor 10kA.