MV eHouse 33kV 25MVA and 49,5MVA for battery energy storage system
Luton (United Kingdom)
Country
Year
Description
The project consists in the design, manufacturing, and commissioning of an eHouse in the Chapel farm plant 49,5MW/99MWh near Luton (UK), connected to the Tesla Battery Energy Storage System (BESS).
It includes n. 1 switching station STC-Box , including 36kV 1250A 31.5kA(1s) MV AIS Normal Clad switchgear, LV switchboard Euro SDS, Patch panel Euro P&C, UPS battery, HVAC system, auxiliary equipment, plus provision for a centralized SCADA panel and a DNO interface panel.
Related projects to eHouse
EHouse and n. 4 transformation cabins for Photovoltaic plant
Macchiareddu (Italy)
Project realised in Macchiareddu, within a photovoltaic park in Sardinia in one of the most important industrial hubs. This is an area of development increasingly powered by alternative energy, where CR Technology Systems has already been present for some years in the realisation of green projects in the area.
MV eHouse 33KV for battery energy storage system 100MW
Pillswood (United Kingdom)
The project includes the deisgn, manufacturing and supply of nr. 2 E-Houses 33kV, equipped with ATR switchgear 36kV 1250A 20kA(1s) for Pillswood BESS plants 100MW.
