N.2 MV E-House 33kV 50MVA for Tesla Battery Energy Storage System
Yorkshire (United Kingdom)
Country
Year
Description
Design, construction and supply of n. 2 switching stations equipped with power transformers, MV air-insulated ATR switchgear 36kV 1250A 20kA (1s), LV switchboards, and a SCADA system for the remote control, destined to Tesla BESS (Battery Energy Storage System).
The Pillswood e plant in Yorkshire has a total power of 98 MW.
Our switching stations connect the Tesla Megapack to the electrical grid.
Related projects to eHouse
Switchroom and TSO for BESS in France
Cheviré, Nantes (France)
Our eHouse is destined to the largest Battery Energy Storage Systems (BESS) ever built, in the Port of Nantes Saint-Nazaire.
MV eHouse 33KV for battery energy storage system 100MW
Pillswood (United Kingdom)
The project includes the deisgn, manufacturing and supply of nr. 2 E-Houses 33kV, equipped with ATR switchgear 36kV 1250A 20kA(1s) for Pillswood BESS plants 100MW.