N.2 MV E-House 33kV 50MVA for Tesla Battery Energy Storage System

Yorkshire (United Kingdom)

Country

United Kingdom

Year

2022

Description

Design, construction and supply of n. 2 switching stations equipped with power transformers, MV air-insulated ATR switchgear 36kV 1250A 20kA (1s), LV switchboards, and a SCADA system for the remote control, destined to Tesla BESS (Battery Energy Storage System).

The Pillswood e plant in Yorkshire has a total power of 98 MW.
Our switching stations connect the Tesla Megapack to the electrical grid.

Related projects to eHouse

eHouses for thermoelectric power plant

Chieti (Italy)

Design, construction and supply of n. 2 plug-in cabins for the Thermoelectric Power Plant in Chieti, Italy.

MV E-House 24kV for electrical grid

Quito (Ecuador)

The project aims to increase the electrification grid in Ecuador areas which suffer a lack of electricity.