N.2 MV E-House 33kV 50MVA for Tesla Battery Energy Storage System

Yorkshire (United Kingdom)

Country

United Kingdom

Year

2022

Description

Design, construction and supply of n. 2 switching stations equipped with power transformers, MV air-insulated ATR switchgear 36kV 1250A 20kA (1s), LV switchboards, and a SCADA system for the remote control, destined to Tesla BESS (Battery Energy Storage System).

The Pillswood e plant in Yorkshire has a total power of 98 MW.
Our switching stations connect the Tesla Megapack to the electrical grid.

Related projects to eHouse

Switchroom and TSO for BESS in France

Cheviré, Nantes (France)

Our eHouse is destined to the largest Battery Energy Storage Systems (BESS) ever built, in the Port of Nantes Saint-Nazaire.

MV eHouse 33KV for battery energy storage system 100MW

Pillswood (United Kingdom)

The project includes the deisgn, manufacturing and supply of nr. 2 E-Houses 33kV, equipped with ATR switchgear 36kV 1250A 20kA(1s) for Pillswood BESS plants 100MW.