N.2 MV E-House 33kV 50MVA for Tesla Battery Energy Storage System
Yorkshire (United Kingdom)
Country
Year
Description
Design, construction and supply of n. 2 switching stations equipped with power transformers, MV air-insulated ATR switchgear 36kV 1250A 20kA (1s), LV switchboards, and a SCADA system for the remote control, destined to Tesla BESS (Battery Energy Storage System).
The Pillswood e plant in Yorkshire has a total power of 98 MW.
Our switching stations connect the Tesla Megapack to the electrical grid.
Related projects to eHouse
Agrivoltaic: Energy and agriculture in synergy
Montalto di Castro (Viterbo)
Switchroom eHouse designed and manufactured for the Guinza Grande plant in Montalto di Castro, Viterbo.
MV E-House 4.16kV for oil plant
Nafoora (Lybia)
The project includes the design, construction, and commissioning of a compact and modular substation STC-Box and it is addressed to an oil plant in Nafoora, Sirte Bay, in Lybia.
