MV eHouse 33KV for battery energy storage system 100MW

Pillswood (United Kingdom)

Country

United Kingdom

Year

2023

Description

The project includes the deisgn, manufacturing and supply of nr. 2 E-Houses 33kV, equipped with ATR switchgear 36kV 1250A 20kA(1s) for Pillswood BESS plants 100MW.

It is the largest BESS system in Europe (by MWh). The E-House is a crucial component of the BESS plants. It provides a safe and reliable way to connect the battery storage system to the grid, ensuring that the system can be operated efficiently.
BESS, or Battery Energy Storage Systems, is becoming increasingly popular due to their ability to store energy during low demand periods and supply it during high demand periods. This helps to balance the grid and reduce the need for fossil fuel-based peaker plants, which are expensive and emit large amounts of greenhouse gases.
This is an exciting development for the energy storage industry and we are proud to have been a part of this project.
Credit pictures: Harmony Energy Income Trust plc

Related projects to eHouse

MV eHouse 33kV 25MVA and 49,5MVA for battery energy storage system

Luton (United Kingdom)

The project consists in the design, manufacturing, and commissioning of an eHouse in the Chapel farm plant 49,5MW/99MWh near Luton (UK), connected to the Tesla Battery Energy Storage System (BESS).

MV E-House 13.8kV for electrical grid

Puerto Cabello (Venezuela)

The project has included modular shelters and medium and low-voltage switchgears, for the modernization of generators in Venezuela.