Medium-Voltage (MV) Normal Clad Switchgears 7,2kV 630A 20kA (3s)

Donetsk (Ukraine)

Country

Ukraine

Year

2012

Description

The project has involved the implementation of Normal Clad switchgears, addressed to an important industrial, steel and chemical hub in the city of Donetsk.

It has included the study, construction and implementation of n. 16 air-insulated (AIS) medium-voltage Normal Clad switchgears 7,2kV 630A 20kA (3s).

Related projects

Normal Clad switchgear for electrical power grid

Latin America

Design, manufacturing and supply of n. 24 MV AIS Normal Clad cubicles 13.8kV 2500A 25kA equipped with our wireless and battey-less PR.E.SE. (PRedictive Electrical SEnsors), Power transformers 110kV/34,5kV 28/40MVA with ONAN/ONAF, Power Transformer Protection panel, and customized SCADA system.

MV Mobile Substation 23kV

Asunción (Paraguay)

Study, design, construction of a mobile substation 23kV composed of two trailers, 17 m each. It will be used for the extension of the electrical substation, and emergency and maintenance needs, in Paraguay.