Maintenance plan at Gewiss headquarters in Calcinate (Bergamo). Specifically, it is a lighting efficiency intervention outside the plant.
Overall, the project includes:
- N. 60 projectors on 10 light towers 32 meters high
- N. 30 road poles perimeter to the plant
- Replacement of lighting bodies on the various signs
- N. 35 lighting bodies on steel stretches for lighting between the various warehouse bodies
- Energy maintenance works for restoring old plants, using materials provided by Gewiss;
- Monitoring of plants and cleaning of electrical shelters;
- Replacement with new lighting fixtures in light towers, located in the forecourt;
- Requalification and management of entrance guard systems;
- Replacement of medium-voltage circuit-breakers;
- Retrofit of swtichgears.
Related projects to Power station
Switchroom and TSO for BESS in France
Cheviré, Nantes (France)
Our eHouse is destined to the largest Battery Energy Storage Systems (BESS) ever built, currently under construction in France.
MV/HV EHOUSE 36kV FOR PHOTOVOLTAIC PLANT
Arlena di Castro (Italy)
Design, construction and commissioning of the compact substation STC-Box addressed to the photovoltaic plant in Arlena di Castro (Viterbo), studied to deliver sustainable energy and pave the way towards a greener future.