The project has included the works to expand the high-voltage (HV) electrical substation serving the Hydrochem Srl plant in Pieve Vergonte (Piedmont).
C.R. Technology Systems has supervised and coordinated the team and the activities on site, carried out in record times.
In detail, HV electrical equipment was installed and put into service through a process of energizing the substation in two phases, and it included:
- Transformers
- Disconnectors
- Circuit-breakers
- Line insulators
- Surge arresters
- Portal 2 intermediate
- Portal 2 Side stalls A and B
Related projects to Electrical substation
Switchgear 40.5kV for steelwork plant
San Luis Potosì (Mexico)
Design, construction and supply of metal-clad switchgear 40.5kV addressed to a steelwork site in the upland territory of San Luis Potosì, Mexico.
HV Substation 35/110kV 15MVA
Tirana (Albania)
The project has included the construction of an electrical substation in Albania.