eHouse 33kV for PV plant expansion
Viterbo (Italy)
Country
Year
Location
Solutions
Products
Description
We have designed, manufactured and supplied an eHouse intended for the expansion of the photovoltaic plant in Montalto di Castro, Italy.
The compact electrical substation is equipped with a MV switchgear ATR 30kV 2000A 20kA, HVAC, fiscal meter, UPS, die-cast resin transformer, LV switchboards Euro-SDS, auxiliary equipment. This substation project is a significant initiative for the integration of photovoltaic energy into the local electricity grid. This project involves the construction of a substation that will transform the energy generated by solar panels into energy usable for distribution.
Related projects to eHouse
eHouse for Continosa PV and wind plant 90MVA
Macchiareddu (Italy)
Design, manufacture, and supply of our eHouse, the Switching Station STC-Box for the in the Continosa photovoltaic (PV) and wind park 90MVA, within the industrial area of Macchiareddu (Sardinia).
Normal Clad switchgear for electrical power grid
Latin America
Design, manufacturing and supply of n. 24 MV AIS Normal Clad cubicles 13.8kV 2500A 25kA equipped with our wireless and battey-less PR.E.SE. (PRedictive Electrical SEnsors), Power transformers 110kV/34,5kV 28/40MVA with ONAN/ONAF, Power Transformer Protection panel, and customized SCADA system.