Description

We have designed, constructed, and supplied an eHouse STC-Box for the Battery Energy Storage System (BESS), in the UK.

Plug-in compact substation, equipped with MV air-insulated switchgear ATR 36kV 1250A 25kA(1s), LV switchboard 400/230V, patch panel, HV transformer protection panels, HVAC system, UPS battery and rectifier, fire detection system, auxiliary equipment.
Our team collaborated synergistically to achieve the best possible engineering design and technological features, drawing on the large experience of each member. Through meticulous planning and execution, we ensured an efficient and safe plant, as confirmed by the successful FAT tests.

Related projects to eHouse

MV eHouse 33KV for battery energy storage system 100MW

Pillswood (United Kingdom)

The project includes the deisgn, manufacturing and supply of nr. 2 E-Houses 33kV, equipped with ATR switchgear 36kV 1250A 20kA(1s) for Pillswood BESS plants 100MW.

MV E-House 13.8kV for electrical grid

Puerto Cabello (Venezuela)

The project has included modular shelters and medium and low-voltage switchgears, for the modernization of generators in Venezuela.