Design, manufacturing and supply of n. 3 switchrooms for Gallitello connection substation 30/220kV in Gibellina area. It is an essential element for trengthening the region’s energy resilience and integrating renewable energy sources into the Sicilian national transmission grid.

The project includes the installation of n. 3 connection-ready Switchrooms, designed to operate in challenging environments and equipped with:

  • Medium-voltage electrical switchgears ATR 36kV 2500A 25kA;
  • Low-voltage switchboards Euro-SDS and SCADA system for real-time monitoring;
  • Protection and control panels, UPS systems, batteries, and 100kVA auxiliary transformers to ensure 24/7 operability;
  • Integrated HVAC systems for temperature control in technical rooms housing critical equipment.
The infrastructure enables the transformation and connection between the 30kV collection grid and the national transmission grid, accelerating the energy transition toward a more sustainable future.

Related projects to eHouse

N. 3 e-Houses for agrivoltaic plants

Naples

N. 3 switchrooms for the agrivoltaic park in Giugliano (Naples), with a total nominal power of 86.63 MW and an annual clean energy production of over 130 GWh. This will supply electricity to 48,000 households, avoiding the emission of more than 60,000 tons of CO₂ and improving crop yield and productivity.

E-Houses for BESS 100MW and 50MW-200MWh

Lakeside (UK) and Belgium

eHouse addressed to Tesla BESS plants 100 MW in Lakeside and 50MW-200MWh for Eneco, in Belgium.